The Mount Nansen mine Yukon produced 41,500 ounces of gold and 234,200 ounces of silver between 1968 and 1999. It also left behind 540,000 tonnes of tailings, 800,000 tonnes of potentially acid-generating waste rock, and a contamination legacy that will cost Canadian taxpayers tens of millions of dollars to address — a clean-up that is not expected to be complete until the early 2030s.

The site is not an outlier. It is one of eight abandoned mine sites in the Yukon and Northwest Territories managed under Canada's Northern Abandoned Mine Reclamation Program, backed by $6.9 billion of federal funding committed through to 2035. Across northern Canada, the pattern repeats: a company extracts mineral value, operations become uneconomic, the site is abandoned, and the environmental liability passes to government, to taxpayers, and to the Indigenous communities on whose traditional territory the damage occurred.

Mount Nansen is worth examining in detail — not to relitigate decisions made decades ago, but because the ground conditions that created the contamination problem were knowable before mining began. The geology, the hydrology, the acid-generating potential of the waste rock, the sensitivity of the receiving environment — these were not surprises that emerged only after operations ceased. They were characteristics of the site that thorough early-stage ground screening would have documented.

This article is a factual account of the Mount Nansen mine site: its history, its geology, its contamination legacy, and what it illustrates about the value of early-stage site assessment in mining exploration.

📍 Site facts

Mount Nansen mine is located approximately 60 kilometres west of Carmacks in the central Yukon, Canada, within the traditional territory of the Little Salmon/Carmacks First Nation — known in Northern Tutchone as Enozhí Ddhäw. The site sits along Pony, Back and Dome Creeks, which flow into Victoria Creek and the Nisling River.


Geology of the Mount Nansen Mine Site

Mount Nansen itself is a deeply eroded Mid-Cretaceous stratovolcano located in the Dawson Range of the central Yukon, rising to 1,827 metres above sea level. The volcanic complex consists of rhyolite, dacite and andesite flows, breccias and tuff — all formed during a period of subduction under North America approximately 100 million years ago.

This volcanic geology is significant for mining because volcanic arcs and their associated hydrothermal systems are classically associated with epithermal gold and silver mineralisation — the type of deposit exploited at Mount Nansen. The same geological processes that concentrate precious metals also commonly produce sulphide minerals in the surrounding rock and waste material. When sulphide-bearing waste rock is exposed to air and water through mining operations — in open pits, in tailings storage facilities, in waste rock dumps — it can oxidise and generate sulphuric acid. This acid then dissolves heavy metals from the surrounding rock, producing contaminated leachate that migrates into groundwater and surface water.

This process — acid rock drainage — is one of the most significant and persistent environmental challenges in hard rock mining worldwide. At Mount Nansen, the Canadian federal government's own documentation identifies potentially acid-generating waste rock and potentially acid-generating tailings as the primary environmental concerns on site, alongside soils with elevated concentrations of metals and impacted tailings water.

The geology of the site did not make acid rock drainage inevitable. But it made it a foreseeable risk — one that thorough geological characterisation before and during mining operations should have identified and planned for.


History of Mining at Mount Nansen Yukon

Mineral exploration at Mount Nansen began in the 1940s. Active mining occurred across three distinct periods:

1
1968 – 1969
First period of active mining. Initial exploitation of the gold and silver deposit.
2
1975 – 1976
Second period of mining operations. Site returned to care and maintenance between periods.
3
1996 – 1999
Most extensive period of mining under BYG Natural Resources Inc. Open pit mining adjacent to Pony Creek produced the majority of the site's gold and silver output. BYG ceased operations in 1999 due to licensing issues, declining metal prices and financial difficulties. The company went bankrupt and abandoned the site.
!
1999
Site abandoned. Federal government assumed responsibility. A Yukon judge later described the situation as "an embarrassment to Canada." 540,000 tonnes of tailings and 800,000 tonnes of waste rock left on site.
4
2003
Mount Nansen became a Type II abandoned mine site under the Yukon Northern Affairs Program Devolution Transfer Agreement. Government of Canada accepted formal responsibility for pre-2003 environmental liabilities.
5
2012
Governments of Canada, Yukon and Little Salmon/Carmacks First Nation agree on a preferred remediation option after nine years of study and consultation.
6
2019
Mount Nansen Remediation Limited Partnership (MNRLP) — a joint venture between Ensero Solutions and JDS Energy and Mining — selected as the new site owner, obligated to remediate as per the agreed plan.
7
2021 – 2022
MNRLP officially assumes ownership. Water treatment plant constructed and commissioned. Surface and groundwater monitoring programme established.
!
April 2024
Yukon Water Board approves emergency licence amendment after declaring that untreated water in the tailings storage facility constitutes an environmental emergency. Risk of catastrophic tailings spill prompts installation of mobile water treatment plant and increased discharge capacity.
October – November 2025
Demolition of the abandoned mill completed. Mill had been the largest remaining structure on site. 10 truckloads of chemically contaminated water and waste removed to British Columbia. Groundwater study at mill site initiated.
8
2029 – 2032 (planned)
Active remediation expected to begin, pending assessment and permitting. Plan involves backfilling the pit with tailings and contaminated material, installing a pit cover, removing the tailings dam and restoring the Dome Creek valley. Remediation expected to take approximately three years.

The Scale of the Mount Nansen Mine Environmental Legacy

540,000
tonnes
Tailings left on site when BYG abandoned the mine in 1999
800,000
tonnes
Potentially acid-generating waste rock remaining on site
25+
years
Duration of ongoing contamination since abandonment in 1999

The contamination concerns documented at Mount Nansen include soils with elevated concentrations of heavy metals, acid-generating tailings leaching into receiving waterways, and impacted tailings water that required an emergency water treatment intervention in 2024. The Little Salmon/Carmacks First Nation — whose citizens have used the area for traditional activities, subsistence hunting and gathering since time immemorial — has consistently raised concerns that contamination in and around the site has been increasing more than two decades after the mine was declared abandoned, and that water treatment at the site has been addressing only a fraction of the contaminants of concern.

The environmental and human cost of this situation is significant and ongoing. The financial cost to Canadian taxpayers is part of a $6.9 billion federal remediation programme covering eight northern abandoned mine sites, of which Mount Nansen is one of the smaller projects.


What Mount Nansen Reveals About Ground Screening in Yukon Mining Exploration

It would be historically inaccurate to suggest that the problems at Mount Nansen resulted simply from a failure to do preliminary ground screening. Mining practices, regulatory frameworks and environmental standards have changed substantially since the 1940s, 1960s and 1990s. What was permitted, what was required, and what was understood about acid rock drainage and tailings management has evolved considerably.

What the site does illustrate clearly is the relationship between geological characteristics, ground conditions and long-term environmental liability — and why understanding those characteristics thoroughly at the earliest possible stage of exploration is fundamental to responsible site assessment.

The geology signalled the risk

Volcanic arc geology with associated epithermal mineralisation and sulphide-bearing country rock is a known acid rock drainage risk environment. The rhyolite, dacite and andesite flows, breccias and tuff that characterise Mount Nansen's volcanic complex are not geologically neutral materials in an open-pit mining context. A thorough early-stage geological assessment of a site with this profile would flag acid-generating potential as a primary geohazard requiring specific consideration in mine design, tailings management and site closure planning.

The hydrology amplified the consequences

The site sits along Pony, Back and Dome Creeks, which flow into Victoria Creek and the Nisling River — a watercourse system that the Little Salmon/Carmacks First Nation has depended on for traditional activities and subsistence for generations. Contamination introduced into this drainage system does not stay on site. The hydrological connectivity between the tailings storage facility, the receiving creeks and the broader watershed is exactly the kind of environmental sensitivity that early-stage hydrogeological assessment is designed to identify.

The permafrost context mattered

Central Yukon contains areas of discontinuous permafrost. Permafrost conditions affect tailings behaviour, seepage patterns, drainage system design and the long-term stability of engineered structures including tailings dams. In permafrost-affected terrain, the design of tailings storage facilities requires specific geotechnical consideration that goes beyond what is required in temperate environments. The 2024 emergency at the Mount Nansen tailings storage facility — where the Yukon Water Board determined that untreated water posed an immediate environmental risk — illustrates how tailings management in northern environments requires sustained geotechnical attention across the full life of the site.


The Remediation Plan and What Comes Next for Mount Nansen

The preferred remediation option agreed by the governments of Canada, Yukon and Little Salmon/Carmacks First Nation in 2012 involves:

  • Backfilling the Brown-McDade open pit with tailings and contaminated material from across the site
  • Installing an engineered cover over the pit
  • Removing the tailings dam
  • Restoring the Dome Creek valley
  • Demolishing the mill and remaining surface infrastructure — completed in 2025

The formal project proposal is expected to be submitted to the Yukon Environmental and Socio-economic Assessment Board in 2025, with the assessment and permitting phase expected to conclude around 2029. Active remediation would then take approximately three years. Long-term environmental monitoring will follow.

The Little Salmon/Carmacks First Nation has raised consistent concerns throughout this process about the adequacy of the cleanup, the treatment of only a fraction of the contaminants of concern, and the pace of progress. Chief Russell Blackjack of the First Nation has stated publicly that the community wants the site cleaned properly, including the tailings pond, because the legacy contamination will affect the land for generations. These concerns remain unresolved as of the date of this article.

⚠ An ongoing situation

The Mount Nansen mine remediation is an active and contested process. The Little Salmon/Carmacks First Nation has formally disputed the adequacy of remediation work and raised concerns about treaty obligations. Readers seeking current information on the status of the site and the First Nation's position should consult the Mount Nansen Remediation Limited Partnership website and Crown-Indigenous Relations and Northern Affairs Canada directly.


Early-Stage Ground Screening in Yukon Mining Exploration Today

Modern mineral exploration in the Yukon operates under significantly more robust regulatory requirements than those that governed mining at Mount Nansen in the 1960s and 1990s. The Yukon Environmental and Socio-economic Assessment Act, the Yukon Waters Act, and the requirements of the Yukon Environmental and Socio-economic Assessment Board all require meaningful environmental assessment before significant exploration or development activities proceed.

But regulatory compliance and thorough early-stage ground screening are not the same thing. Regulatory requirements establish a minimum standard. Thorough ground screening at the earliest possible stage of exploration — before capital is committed, before infrastructure is positioned, before the scope of potential environmental liability becomes clear — serves a different purpose. It gives exploration teams, investors and regulatory bodies a clearer picture of what a site involves before the decisions that are most expensive to reverse have been made.

The specific ground condition factors that a preliminary site context assessment for a Yukon exploration site should address include:

  • Geological characterisation — rock types, mineralisation style, sulphide content and acid-generating potential
  • Permafrost and frost hazard assessment — extent and character of permafrost, implications for site infrastructure and tailings management
  • Hydrogeological context — surface drainage, groundwater connectivity, receiving water sensitivity
  • Geohazards — slope stability, seismic risk, flood risk in the context of northern hydrology
  • Environmental sensitivity — proximity to watercourses, fish habitat, traditional land use areas
  • Historical land use — prior exploration or mining activity and any associated legacy contamination

None of these factors require fieldwork to assess at a preliminary level. Publicly available geological mapping, hydrogeological data, environmental databases and historical records provide a substantial evidence base for early-stage site context assessment before any physical investigation is commissioned.

💡 What this means for exploration teams

A preliminary desktop site context report — covering geology, permafrost risk, hydrogeology, geohazards and environmental sensitivity — is the appropriate first step before committing exploration budget to a Yukon or northern Canadian site. It does not replace the detailed environmental and geotechnical investigations that will be required before development proceeds. What it does is establish the ground condition context that informs whether a site is worth pursuing further, and what the key risk factors are likely to be.

Is this site worth committing exploration budget to?

Generate a preliminary geological, geotechnical and environmental site context report for any exploration target in Canada, Australia, Africa and beyond. Understand the ground context before fieldwork begins. From $19.

Generate an Exploration Screening Report →
Important notice: This article is an informational account of the Mount Nansen mine site based on publicly available sources. AIGEOREPORT generates preliminary site screening reports for planning-stage informational use only. Reports do not constitute professional geotechnical, geological, environmental or legal advice and do not replace formal site investigation, environmental assessment or regulatory compliance processes. The Mount Nansen remediation is an active and ongoing process — information in this article reflects publicly available sources as of April 2026.